Route 4 & 17 Interchange
Scope of Services:
The major construction elements of this project consisted of:
two (2) new third level direct flyover ramps; (325 - and 265 -
meters - long); reconstruction of an existing loop ramp;
widening and reconstruction of Route 4 & Route 17; extensive
relocation of utilities; and, construction of an auxiliary
interchange and a new service road. In order to minimize
disruption to the traveling public, area businesses, local
residents and emergency services, this extremely complex project
required special attention to scheduling, MPT and communication
with all stakeholders. The construction schedule of this project
from a three and a half year time frame to 13 month
super-accelerated schedule provided for substantial incentives
to the contractor and required an extremely experienced,
knowledgeable and flexible inspection staff.